First Soyuz almost ready for launch from French Guiana
Kourou, French Guiana (ESA) May 05, 2011 The final countdown before its maiden flight later this year has begun for Soyuz with a simulated launch campaign at Europe's Spaceport in French Guiana. This dry run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch, except the fuelling of the vehicle. Last Friday, one of the two Soyuz launchers already at the Spaceport was rolled out of the preparation building horizontally using the 600 m-long railway leading to the launch platform. The vehicle was then erected into the vertical position and suspended over the pad with the use of four support arms. The mobile gantry, built specifically for Soyuz operations in French Guiana, was rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher. The rehearsal is simulating the five-day final phase before launch, planned on 4 May. The final countdown will be performed, including the gantry's rollback to its parked position, 80 m from the pad. It will be intentionally stopped to validate the procedures in the event of a launch interruption. The countdown will resume on 5 May with a simulated liftoff and flight downrange. These tests will give the green light for the first Soyuz flight from French Guiana in the third quarter of 2011. The dry run in pictures is available here.
Share This Article With Planet Earth
Related Links Soyuz at ESA Space Technology News - Applications and Research
U.S. Air Force Poised To Launch First-Of-Its-Kind Space Based Infrared System Satellite Cape Canaveral AFS FL (SPX) May 05, 2011 The first Space Based Infrared System (SBIRS) geosynchronous (GEO-1) satellite stands at Cape Canaveral Air Force Station, Fla., prior to being mated with the launch vehicle in preparation for its May 6 blastoff. The U.S. Air Force and Lockheed Martin are ready to launch the first Space Based Infrared System (SBIRS) geosynchronous (GEO-1) spacecraft on Friday, May 6 aboard a United Launch ... read more |
|
The content herein, unless otherwise known to be public domain, are Copyright 1995-2010 - SpaceDaily. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement |